Project Profile - Buffalo Bills Practice Stadium


PROJECT TERM:
1995 - 1996

PROJECT LOCATION: 
Orchard Park, New York

TOTAL PROJECT COST: $1,500,000

PROJECT SIZE: 100,000 Sq. Ft.

PROJECT DESCRIPTION:

  • 424 ft. x 224 ft. single story, high ceiling practice building for the Buffalo Bills Football Team.
  • Use of long span (224 ft.) rigid steel frames.
  • 48" x 60" diameter moment resisting drilled piers.
  • High variable, decomposed shale bedrock conditions.
  • SCOPE OF SERVICES:

  • Geotechnical Analysis
  • Foundation Report
  • Earthwork/Foundation Recommendations
  • CONTACT:

  • Duchscherer Oberst Design, P.C.
    Mr. Julian Synder (Project Engineer)
    716-882-0100
  • Buffalo Bills Field House